UPS battery configuration method

UPS battery configuration method

2. Calculate DC power demand;

2. Find suitable batteries to meet DC power demand;

3. Adjust the number of batteries and groups to meet the requirements of 1 and 2;

General principle:

1. The number of groups is generally not more than 4 groups, and 2 groups are appropriate;

2.12V battery is typically lowered by 2V battery, generally preferably 12V battery;

3. If the number of UPS battery is adjustable, do not configure to a minimum;

4. Constant power calculation methods are more accurate than constant current calculation methods.

calculation steps:

Step 1: Determine 7 parameters

These parameters are determined by UPS and user requirements.

Group 1 set

Step 2: Calculate DC power requirements (monomer)

Step 3: Select the battery

In your demand time column, lookup is greater than or equal to DC power (the result of the second step) requires a suitable battery model.

But the maximum power C & D12-775A DNT can not meet the requirements (776.6 <1418.44)

Step 4: Adjust the number of groups recalculated

2 groups can meet and exceed the requirements (776.6> 709.22)

Step 5: Determine the discharge capability of this battery in this discharge time period

Step 6: What is the expected backup time of this group of battery configuration?

Step 7: Adjust the number, optimization plan