That’s not the case. I’ve Seen the Cost Difference Between Shops be more than percent. How is this public, and how can it be fixed?

  

  

  Parts Also Increase Tooling Cost.

  High-Stream Steel Also Tend to Require More Costly Tooling.

  MADE on a Small Mill.

  California. Designing and Building Dies is Labor-Intensive, and Labor Cost is a Large Factor.

  CHANCES are the stamper will get a similar quote.

  Work, The Estimate MAY Be more Competitive.

  

  Back to a Poor Process or POOR Tool-Making Techniques, Results in a TENDENCY to Quote Similar Dies Significantly Higher.

  WHO KNOWS How to Design and Build A Quality Process and Die.

  steps needed to make the part.

  Will Most Likely Result in a Significant Differente in the Quoted Costs.


Posted

in

by

Tags: