What is the installation, adjustment and maintenance of the linkage console? Xiaobian learned about detailed knowledge in the manufacturer, let’s learn together.
(1) The linkage console application mounting screw fixes. (2) According to the requirements of the electrical schematic, the linkage station is separately operated, and whether the partition of the contact is consistent with the contact finger table. If it does not match, the cam piece should be adjusted or replaced. (3) Check that the electrical system, resistors, and control screens, such as electric system, and whether the ground is reliable before power-on. For the main liners, the main switch should be turned off before power-on, only manipulating the control loop, to observe whether the running procedures of each contactor are correct. (4) After power-on, the motor operation should be carefully checked according to the corresponding cam controller and the control screen manual. If there is a difference, the power will be cut off immediately, and the reason can continue to be powered on. (5) The linkage station should be checked frequently in accordance with the following requirements. All screw coupling parts must be fastened, especially the contact wiring screw, and the friction portion should always maintain a certain lubrication; there is no obvious melt in the surface of the contact, and the smelted portion can be carefully repaired with a detachable knife, and sandpaper is not allowed. For the 10-DC contact group When replacing the contact, magnets must be assembled according to the following; if the damaged parts are replaced in time.
Renewable reasons can continue to be powered
by
Tags: