  Powering Off the Inverter

When Powering Off The Inverter for Maintenance, Please Follow The Steps Below:

  ① FIRST, Select The "Grid Off" Option Through the Inverter LCD.

  →→→ →

  Make Sure the DC Switch is Switch Off Under No Current & Load Condition, which is good for dc switch lifetime and system saving.

  evending.)

  Inverter Power-on and Grid-Connect Operation

After mailing of the pv plant or the incret is complete, it is recommended to follow the steow for power-on and grid-conftenedly:

  Inverter DC Switch, Which Can Avoids The 1 TO 3 Minutes of Grid Connection Delay Caused by the "No Grid" Alarm.

  ② Then, select the "grid on" option through the inverter LCD.

  →→→ →

  ③You Must Ensure That the Grid Parameters of the Inverter Are Set to the Local Distributor ’s Requirements.

  Please Pay Attention to All the DC DATA and Accusters Displayed on The LCD Should Are Normally Displayed BeFore You Leave the Site.